Kitchen Remodel
The work goes into the layout, the storage, the island, the lighting and how the room connects to the rest of the first floor. When the plan calls for custom kitchen cabinets, they're built for the space.
Building or adding on in Homer Glen comes down to two things the Village is specific about: what the outside of the first floor is made of, and how the house gets its water and sewer. We're a New Lenox-based custom home builder and remodeling contractor, about 15 miles from Homer Glen Village Hall, and we plan around both.
Homer Glen has its own exterior construction standards, adopted in 2001. A new house in any residential zoning district needs stone or brick covering 100 percent of the first-floor exterior walls, not counting doors, windows and trim. A chimney on an exterior wall has to be brick or stone from the ground to the cap, and metal walls aren't allowed as a finish on a house.
The Village Board can grant a variance for a design of exceptional architectural merit, but never for aluminum, vinyl or plastic siding, or imitation brick or stone sheeting. The Village Manager can approve other materials as accents on up to 5 percent of the surface, but not just to bring the cost down.
There are layout rules too. No more than three car bays can face the street, and a garage with more than three bays in a row has to load from the side. A principal house is limited to two stories or 35 feet unless a planned development allows more.
Masonry is a real line in the budget, so we price it from the first sketch. We work with the architect so the elevations, the garage orientation and the estimate all reflect the Village's rules before the drawings go in for review. Read more about how we work as a custom home builder.
Many Homer Glen homes were standing before the exterior standards took effect in November 2001. For those houses, an addition or alteration doesn't have to meet the brick-or-stone rule, as long as its exterior finishes are architecturally consistent with the house as it was when the standards were adopted.
That fits how we build additions anyway. Added square footage should read as part of the original house, not something tacked on later. We match the siding, brick, rooflines and trim so the addition looks like it was always there.
Before design starts, we confirm what the house was finished in and how the zoning district's setbacks and lot rules apply to your lot. The plans go in already inside what the code allows.
Not every part of Homer Glen is on city water and sewer. The Village's E-1 district is meant for large rural estate lots in areas where public utilities aren't readily available, while the R-3 district and the denser districts are required to be on central water and sanitary sewer.
Where a house runs on a well or septic, the zoning code requires enough open ground for a sewage disposal system and water supply that meet the standards of the Will County Health Department and the Illinois Department of Public Health. Site plans submitted with a building permit have to show the septic system and the well location.
That makes the septic field and the well one of the first things we look at on a rural lot. An addition, a new garage or a larger driveway can't simply go where it fits. We locate both before the footprint is drawn, so the plan doesn't stall at permit review.
Homer Glen's zoning allows an accessory unit inside a single-family home as a special use in certain residential districts. It's meant for people 62 or older who want to stay close to family.
The rules are specific. There's one unit per lot, it can't exceed 700 square feet, and it has to sit entirely inside the main house, not in a garage or outbuilding. The house has to keep the look of a single-family home, with the same number of front entrances it had before. One occupant has to own the property, and the unit is for someone 62 or older who is related to an owner.
The special-use application needs floor plans for building the unit and for converting the house back to a single-family home later. Owners also file an affidavit with the Village by January 31 each year. We draw the suite and the reconversion plan together, so the application goes in complete.
One project manager runs your job from design through the final walkthrough, whether it's a single room or the whole house.
The work goes into the layout, the storage, the island, the lighting and how the room connects to the rest of the first floor. When the plan calls for custom kitchen cabinets, they're built for the space.
A bigger primary bath can often come from space you already have, such as a closet or an adjoining room, without adding footprint.
Homer Glen has adopted the 2024 International Residential Code with its own amendments. One of them requires every basement to have at least one egress window or door, and every new sleeping room needs its own emergency egress. If a basement bedroom is part of the plan, we design and price the egress from the start.
Decks, patio covers and screened porches go to our sister company, EZ Deck Co. EZ Custom Homes doesn't take on deck work.
More detail on each service is on our home remodeling page.
The Village requires permits for new homes, interior and exterior remodels, additions, garages, roofing, siding, windows and doors. Permits for new construction and larger projects are submitted in person.
Each application can go through several departments, covering building, zoning and engineering. The Village says a single-family home can take up to a month to review, and that review times change with the time of year and how complete the submittal is.
Every permit requires inspections. On new construction, the Village's amendments add inspections of the footings and of every concrete slab, including garage and basement slabs, before any concrete is placed. We build those inspections into the schedule and keep the site ready for them.
Scope, budget and fit first. Then the lot: zoning district, well and septic, and whether the house predates the 2001 exterior standards.
The architect draws to the Village's exterior standards and zoning, and we price the plans in a written, itemized estimate as part of our preconstruction phase.
Where a well or septic system is on the lot, the site plan shows both, with room for the system the Will County Health Department requires.
The plans go to the Village for building, zoning and engineering review. Nothing starts on site until a permit is issued.
Footing, foundation and slab inspections before concrete, then the rest of the inspections as the work moves along.
We walk the finished space with you and check it against what you signed off on. Any punch list items get settled before we close out.
Tell us what you'd like to build or change. We'll look over the lot and the house together, check what the Village's rules allow, and give you a realistic sense of cost.
Reach out and we'll talk through your project, give honest feedback, and help you understand what makes sense. You decide how to move forward.
Your project manager keeps you in the loop from first call to final walkthrough.