Home Additions
A second story when the lot is near its coverage cap, or a primary suite or family room where there's room to build out. Either way, the addition ties into the existing structure and roofline so it reads as part of the original house.
In Lockport, how much you can add depends on two things: your zoning district, and whether your house sits in the downtown historic district. We're a New Lenox-based remodeling contractor and custom home builder, about 11 miles from Lockport City Hall, and we plan around both.
Lockport's zoning code, adopted in 2021, caps how much of a lot can be covered by buildings, counting the house and any roofed accessory building. The cap is 25 percent in the E-R Estate district, 30 percent in R-1 and R-2, 35 percent in R-0 Heritage and R-3, and 45 percent in R-4.
A second cap covers impervious surface: roofs, concrete, asphalt and pavers together. It ranges from 40 percent in E-R to 60 percent in R-0, so a patio or a wider drive can use up room an addition might need. The code leaves out a front walk up to five feet wide and a driveway that runs straight to the garage door, and permeable pavers count at half their area.
Setbacks matter as much as coverage. Interior side yards are 6 feet in R-0, R-2, R-3 and R-4, 10 feet in R-1 and 15 feet in E-R, and there's a 50-foot lowlands yard next to any creek, pond, wetland or floodplain. Houses are capped at 35 feet in every district except R-4, which allows 45. We check your district and run the numbers for your lot before design starts.
An attached garage can't be larger than 75 percent of the house's foundation area. On a house with a foundation under 533 square feet, a standard 20-by-20 two-car garage is still allowed without a variation. A detached garage is capped at 660 square feet or 75 percent of the foundation area, whichever is less, and a single-family home gets one of each at most.
Turning an attached garage into living space is allowed, but the code requires the driveway that led to it to be removed and landscaped and the curb cut restored. That work belongs in the budget from the start, along with the new insulation, the floor and the heating.
Downtown Lockport was platted in 1836, the year construction began on the Illinois & Michigan Canal, and two years later it became the canal's headquarters. The Lockport Historic District was added to the National Register of Historic Places in 1975.
Inside the City's Historic Preservation District, the Heritage & Architecture Commission reviews demolition, alterations and new construction and issues Certificates of Appropriateness. Any change in the district goes through that approval process, and the City's list of minor work that doesn't need a permit doesn't apply there.
The R-0 Heritage Residence district has its own rules, aimed at homes consistent with the area's historic architectural styles. If the neighboring houses sit closer to the street than 25 feet, the average of the two sets your front setback. A front porch is allowed with a roof and open sides and front, in materials consistent with the house.
For a downtown project, we put the Commission's review in the schedule and settle the exterior details early, so fewer changes go back for another review. Not sure whether your house is in the district? We'll check with the City before design starts.
The City requires a permit for additions, garages, porches and other structures, for plumbing, electrical and mechanical work, and for any alteration that cuts into a wall or removes or cuts a structural beam or bearing support. Painting, patching, new flooring and kitchen cabinets in the same location don't need one, except in the historic district.
Lockport adopted the 2024 International Building, Residential and Existing Building Codes and the 2023 National Electrical Code. Projects submitted for a permit on or after January 1, 2026 are reviewed under the new codes.
The City says most residential reviews take 10 to 14 business days when the submittal is complete and every contractor on the job is registered with the City. A remodeling permit is good for 6 months and a new home permit for one year, so we sequence the work to finish inside that window.
One project manager runs your job from design through the final walkthrough.
A second story when the lot is near its coverage cap, or a primary suite or family room where there's room to build out. Either way, the addition ties into the existing structure and roofline so it reads as part of the original house.
The work goes into the layout, the storage, the island, the lighting and how the room connects to the rest of the first floor. If walls come out, the permit and any structural work are planned before demolition.
A bigger primary bath can often come from space you already have, such as a closet or an adjoining room, without adding footprint.
Decks, patio covers and screened porches go to our sister company, EZ Deck Co. EZ Custom Homes doesn't take on deck work.
More detail on each service is on our home remodeling page.
A new custom home in Lockport starts with the lot's district. In a neighborhood of up to 15 lots, the minimum lot is 30,000 square feet and 150 feet wide in E-R, 9,000 square feet and 75 feet in R-1, 8,000 square feet in R-2 and 7,000 square feet and 50 feet in R-0.
The coverage, setback and garage limits above apply to a new house too. We work with the architect so the layout, the elevation and the budget fit those numbers before the drawings go in. Read more about how we work as a custom home builder.
Scope, budget and fit first. Then the lot: zoning district, coverage, setbacks, any lowlands yard, and whether the house is in the historic district.
The architect draws to the zoning code, and we price the plans in a written, itemized estimate as part of our preconstruction phase.
Inside the Historic Preservation District, the Heritage & Architecture Commission reviews the design and issues a Certificate of Appropriateness.
The plans go to the City's Building Department. Nothing starts on site until a permit is issued.
Inspections as the work moves along, with the schedule set to finish inside the permit's term.
We walk the finished space with you and check it against what you signed off on. Any punch list items get settled before we close out.
Tell us what you'd like to add or change. We'll look over the house and lot together, check what the rules allow, and give you a realistic sense of cost.
Reach out and we'll talk through your project, give honest feedback, and help you understand what makes sense. You decide how to move forward.
Your project manager keeps you in the loop from first call to final walkthrough.